Bannu Bypass Road

24
Kabul 1
Banu
24 Kabul 1 Banu

Construction of Circular Bypass Road Bannu (Package I & II)

Name of contract: Construction of Circular Bypass Road Bannu (Package I & II)

Value (Rs.) Million: 1150 Million

Start Date: Aug 2019

Completed: 5%

Scheduled completion date: Aug 2021

Project Objectives and benefits:  The Work consists of Subgrade Preparation in Earth Cut & Road Cut, Formation of Embankment from Roadway Excavation & Borrow Excavation, Roadway Excavation, Compaction of Natural Ground, Removal of Trees, Clearing & Grubbing, Asphaltic Base Course, Water Bound Macadam Base Course, Granular Sub Base Course using Pit Run Gravel, Double bituminous Surface Treatment, Asphaltic Wearing Course, Bituminous Tack Coat, Bituminous Prime Coat, Structural backfill using Common Material, Providing and Laying stone pitching / filling, Supply & fabricate M.S. reinforcement for cement concrete    (Grade 60), RCC in roof slab, beam, column & other structural members, insitu or precast, Plain Cement Concrete including placing, compacting, finishing & curing, Random rubble masonry, Steel Post of Metal Guard Rail, Road signs etc at Circular Bypass Road Bannu.